Winter work has started on three bathrooms –

For those of you who stayed in Poire this year, you may have noticed the bouncy floor in the doorway of Poire – there had been a water leak under the walls in the bathroom, so I have pulled everything out (walls ‘n’ all) to replace the floor, replace the walls making the bathroom bigger and bringing the washbasin into the bathroom – new tiles all round.

The second bathroom was also tired so I have decided to make it bigger and install a bath with shower over.

Pomme’s shower room also had a leaking problem, so the shower tray has been taken out all to be replaced and spruced up with new tiles.

Watch this space for more updates!